Wednesday, 28 December 2016

Pedaling Across Malaysia - Progress up until now

With only a few days left in 2016, here's a brief summary of what I've prepared up until now and what I've yet to do.

Bought the following equipment:
  • 2 spare tubes (was initailly 3 but I'll get to that later) RM54 (RM18 per tube)

  • 2 Continental Gatorskin 23mm tyres - they're known for their high degree of puncture-resistance. RM320 for both tyres. The outgoing pair was riddled with holes, cuts and tiny pieces of metal stuck in them. Quite surprised they were in such shape. I'll be hanging on to them though, to use as potential spares on the ride should I need them.
New Gatorskin tyres, will probably do a review of them soon 

Couple of holes on the old treads


Didn't notice this sliver of steel in the old tyre

Amazed it didn't pierce the inner tube

  • 1 spare 10 speed chain - the current chain on my bike is already worn out but my shifts are still crisp and the chain has yet to jump under load so I'll keep the old chain on first. In the event it snaps along the ride, I'll switch to the new one. RM100



Loaned/sponsored equipment:
  • Sony HDR AS300 Action Camera - I've gotta thank Mr Timothy Gan from Sony Malaysia and Carmen Cheong for mentioning me to him. Would never have gotten such a cool camera without either or you.

  • Bicycle lights - Front and rear lights sponsored by my aunt, thank you Aunty Peng!


Already owned items:

  • A mini pump
  • 1 spare inner tube
  • Multitool with a chain tool
  • Tyre levers
  • Chain quick links X 2
  • Saddle bag
  • Ruck sack
  • Bicycle lock
  • Helmet
Sent bike for servicing - I normally do my own servicing but I thought that I had best let the professionals have a look at my bike at least this one time. Just in case I missed anything. So I brought it over to the Specialized Concept Store in Petaling Jaya to let the guys over there have a look. Plus, it came with a wash and wheel truing all for RM50, pretty good deal considering they normally charge RM45 per wheel, excluding other services like the wash. Although if I'm being fair, they did accidentally puncture my inner tube and replaced it with a tube I purchased as a spare....so I guess that sorta makes up for the price. 



Booked my flight ticket (Air Asia) along with check-in baggage (RM67- No sponsorship from Uncle Tony) - Good thing bikes are relatively light. And I managed to find a bicycle box that was going to be thrown away to store it in so it doesn't get too roughed up during the flight. Pedalsport Taipan (check out my shop tour of the store here) was cool enough to just give it to me. So in return, I bought an extra inner tube from them since I always planned to have 4 in total anyway. Thanks guys!

One big empty box - check!

Things yet to be done:
  • I've yet to make hotel reservations.
  • Check all the equipment 
  • Wash my bike prior to leaving
  • Pack my bag

So, up until now, I've spent approximately RM591 on gear and travel expenses. That's a big bite out of the almost RM1000 (RM985)  I received from very generous sponsors. So in no particular order, I'd like to thank the following swell human beings for their generosity and kind-heartedness in helping me out in this little endeavor of mine. You've all helped so incredibly much and I'll never forget your kindness. Thank you all so much! :
  • Mr Edmund Lim
  • Mr Siew and family
  • Ms Elizabeth Loke - all the way from the Land Down Under
  • 2 more donors who wish to remain anonymous. 
And that's about it for now. I think there'll be 1 more update post after this one and then the ride begins! I'd like to extend my gratitude to everyone who's given me support and encouragement up until now. As Day 1 draws closer, I must admit that I'm getting a little more nervous day by day. But maybe that's my body's way of telling me I'm ready. Only time will tell.

To all my readers, I wish you all a very Merry Christmas and a Happy 2017!

No comments:

Post a Comment